| 1. | Accounting reference period 会计参照期间 |
| 2. | Refers to the final results of industrial production of the industrial trade in money terms during the reference period 指工业行业在报告期内以货币表现的工业生产活动的最终成果。 |
| 3. | Others refer to funds received during the reference period which are not included in the above - mentioned sources 其他资金来源:指报告期收到的除以上各种拨款、借款、自筹资金之外,其他用于固定资产投资的资金。 |
| 4. | Value added of industry : refers to the final results of industrial production of the industrial trade in money terms during the reference period 工业增加值:是指工业行业在报告期内以货币表现的工业生产活动的最终成果。 |
| 5. | First , the referenced period was selected and the temperature - affecting coefficient was built to analyze the contribution of climate warming to maize yield 结果表明: 20世纪90年代作物生育期气温条件与以前相比已经发生了显著改变。 |
| 6. | The failure mode and the design reference period of the steel rail are discussed , and the steel rail ' s performance function at limit state is established too 讨论了钢轨的失效模式和设计基准期,建立了钢轨极限状态方程的功能函数。 |
| 7. | The structure dynamic reliability of reference period may be different when monthly , yearly and the reference period maximum wind loads are adopted 同时还分析了采用月最大、年最大及设计基准期最大风荷载对设计基准期内结构抗风动力可靠度的影响。 |
| 8. | Refers to the floor space of buildings completed in the reference period , which have come up to the designed standards and have been put into use 指在报告期内房屋建筑按照设计要求已全部完工,达到住人和使用条件,经验收鉴定合格,正式移交使用单位的建筑面积。 |
| 9. | The business income of labor service co - operation is the income in the form of wages and salaries , overtime pay , bonuses and other remuneration received from the employers during the reference period 劳务合作营业额按报告期内向雇主提交的结算数(包括工资、加班费和奖金等)统计。 |
| 10. | The occurring frequency of wind loads is assumed to obey the poisson distribution , then the method to calculate the dynamic reliability of structures resisting wind loads in reference period is obtained 同时在强风年出现次数满足泊松分布的前提下,得到设计基准期可靠度分析公式。 |